首页 > 中学英语试题 > 题目详情
The Hong Kong-Zhuhai-Macao Bridge (HZMB), the major construction work on the world’s cross-sea bridg...
题目内容:
The Hong Kong-Zhuhai-Macao Bridge (HZMB), the major construction work on the world’s cross-sea bridge, which connects Zhuhai in Guangdong Province with Hong Kong and Macao, was completed on Oct 23, 2018. Construction began in December 2009 at Zhuhai. The Y-shaped bridge starts from Lantau Island in Hong Kong with branches to Zhuhai and Macao.
More than 400000 tons of steel have been used for the 6.7 km undersea tunnel land 22.9 km bridge, enough to build 60 Eiffel Towers. British newspaper The Guardian named the mega structure ( 巨 型 建 筑 ) one of its “seven wonders of the modern world near completion.”
The bridge will cut travel time from Hong Kong to both Zhuhai and Macao from the current three hours by road or one hour by sea to a half-hour drive. It will bring people in Hong Kong, Macao and Guangdong within a “one-hour living circle”, which is expected to attract more visitors to the Guangdong-Hong Kong-Macao Greater Bay Area. The bridge will not only be a transport link. “It will be a social, economic, cultural, and tourism connection ( 联 系 ) among the three areas.” said Yu Lic, deputy director of the Hong Kong-Zhuhai-Macao Bridge Authority.
Su Quanke chief engineer with the administration bureau of the bridge, said the project has made history in many aspects. “With a series of world advanced anti-erosion (抗腐蚀) and earthquake-resistant measures, the bridge can be used for 120 years,” he said. “If it were not for the progress of ‘Made in China’, we couldn’t possibly complete the construction in such a short time, The China technology and China standard set by the Hong Kong-Zhuhai-Macao Bridge will influence ( 影响) the world market.”
1.It takes China to complete the Hong Kong-Zhuhai-Macao Bridge.
A.8 years B.9 years C.10 years
2.We can draw a simple picture of HZMB like .
A.A B.B C.C
3.British newspaper The Guardian named the mega structure one of its “seven wonders of the modern world near completion” because .
A.no one can design undersea tunnels
B.the bridge is taller than the Eiffel Tower
C.The bridge is such a huge construction
4.The third paragraph mainly talks about .
A.the importance of HZMB B.the time to cross HZMB C.a one-hour living circle
5.From the last paragraph, we can infer that Su Quanke is of the project.
A.afraid B.sick C.proud
本题链接: